Hydrogen Safety
Wenger Engineering is a specialist in hydrogen safety. The team works in line with applicable standards, with a strong practical focus and tailored to the specific risks.
Hydrogen Safety Solutions
Safety concepts
Development of comprehensive safety concepts for hydrogen plants or components.
HAZOP
Execution and support of HAZOP, FMEA, LOPA and Bow-Tie analyses.
Lightning protection, explosion protection and fire protection
Services related to ATEX-compliant plants in hazardous environments.
Hazard assessments and risk analysis
Analysis and mitigation of health and safety risks.
Why Wenger Engineering is your partner for hydrogen safety
Wenger Engineering stands for holistic safety planning in hydrogen technology. Due to its physical properties, hydrogen places specific demands on safety, explosion protection and plant design. These challenges are systematically analyzed and translated into well-considered, standards-compliant solutions.
Customers benefit from strong expertise in the assessment of hazard potential as well as in the development and implementation of appropriate protective measures.
The results are safety solutions that not only meet regulatory requirements, but also perform reliably in operation.
Why Wenger Engineering?
- Hydrogen projects since 2007
- Over 750 projects worldwide
- Innovation and pioneering work
FAQ section
Why is hydrogen safety demanding?
Hydrogen safety is particularly demanding because hydrogen is a very light, highly volatile and easily flammable gas that spreads quickly and can form explosive mixtures with air over a wide concentration range. Storage and handling under high pressures or low temperatures require specific materials, sealing systems and safety concepts.
Which analyses does Wenger Engineering carry out in the field of safety?
Wenger Engineering carries out comprehensive safety analyses such as risk and hazard assessments, HAZOP studies, explosion protection analyses and the evaluation of normal and abnormal operating conditions in order to identify potential risks at an early stage and derive appropriate protective measures.
Are legal and normative requirements taken into account?
Yes, all relevant legal and normative requirements are consistently taken into account at Wenger Engineering and implemented across all project phases to ensure safety, compliance and a smooth approval process.
Can safety also be planned in an economically viable way?
Yes, safety can be planned in an economically viable way by integrating protective measures early in the planning process and aligning them with the actual risk profile, so that an optimal balance between safety level and costs is achieved.
Why Wenger Engineering?
- Hydrogen projects since 2007
- Over 750 projects worldwide
- Innovation and pioneering work
Contact us
We look forward to working with you on future projects. Let’s connect without obligation and bring innovative ideas to life.
We look forward to hearing from you.
Maximilian Tiepermann
Key Account Manager
solution@wenger-engineering.com
+49 731 790605-22
Sebastian Graf
Key Account Manager
solution@wenger-engineering.com
+49 731 790605-22
Contact us
We look forward to working with you on future projects. Let’s connect without obligation and bring innovative ideas to life.
We look forward to hearing from you.
Maximilian Tiepermann
Key Account Manager
solution@wenger-engineering.com
+49 731 790605-22
Sebastian Graf
Key Account Manager
solution@wenger-engineering.com
+49 731 790605-22